Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0
Wiki Markup
{scrollbar}

The

...

overall

...

flow

...

of

...

an

...

Agile

...

BI

...

methodology.

...

The

...

Kimball

...

Matrix:

...

the

...

dimension

...

columns

...

and

...

the

...

datamart

...

rows

...

The

...

concept

...

of

...

a

...

'

...

Dry

...

Spike'.

...

Why

...

Inception

...

iterations

...

(Dry

...

Spikes)

...

are

...

not

...

'potentially

...

releasable'

...

(because

...

ETL

...

and

...

schema

...

design

...

is

...

avoided).

...

The

...

importance

...

of

...

metadata

...

to

...

insulate

...

the

...

content

...

and

...

the

...

user

...

experience

...

(which

...

should

...

not

...

change

...

significantly

...

after

...

the

...

inception

...

phase)

...

from

...

the

...

underlying

...

structures

...

(which

...

will

...

change

...

throughout

...

the

...

elaboration

...

and

...

construction

...

process).

...


The

...

importance

...

of

...

iteration:

...

iterations

...

for

...

proof-of-concept

...

and

...

requirements,

...

iterations

...

to

...

build

...

one

...

datamart

...

at

...

a

...

time,

...

etc

...


Discuss

...

different

...

ways

...

datamart

...

projects

...

can

...

relate

...

to

...

each

...

other:

...

sequential,

...

overlapping

...

(sashimi)

...

or

...

parallel.

...


Diagram

...

of

...

the

...

overall

...

process

...


Discuss

...

doing

...

inception

...

and

...

elaboration

...

with

...

open

...

source

...

and

...

then

...

switching

...

to

...

proprietary

...

products

...

for

...

construction.

...

Child pages (Children Display)

...